Many homes in Snohomish and King County were built before lead paint and asbestos were phased out. Water damage often means cutting drywall, pulling flooring, or removing popcorn ceilings, and disturbing those materials can release dust that is harmful to breathe.

Asbestos

Asbestos can be found in drywall joint compound, textured ceilings, vinyl flooring and its adhesive, pipe wrap, and some insulation. Homes built before 1982 are most likely to contain asbestos-containing materials. In the Puget Sound region, a survey is generally required before renovation or demolition work. We work with a trusted local lab for all testing.

Lead

Homes built before 1978 may have lead-based paint on walls, trim, windows, and doors. Federal rules require lead-safe work practices when that paint is disturbed.

Insurance coverage

Testing is usually part of a covered water loss when demolition is required. We will include it in your estimate and explain it to your adjuster.

How we handle it

  1. 1

    Sampling

    Materials in the work area are sampled and sent to our trusted local accredited lab.

  2. 2

    Results

    We explain what was found and what it means for your project.

  3. 3

    Abatement

    If needed, hazardous materials are removed under containment by certified personnel. We coordinate abatement through trusted partners and handle all scheduling and billing.

  4. 4

    Disposal

    Waste is handled and documented according to regulations.

  5. 5

    Continue the work

    Once the area is clear, drying and repairs move ahead.

Standards & guidelines we follow

  • EPA RRP Rule (40 CFR Part 745)Source

    Renovation, Repair and Painting Rule: Lead-Safe Work Practices

    The EPA’s RRP Rule requires that contractors working in pre-1978 homes use lead-safe work practices: containment, HEPA vacuuming, wet methods, and proper disposal. Firms must be EPA-certified. We coordinate with EPA-certified abatement contractors for all lead work.

  • AHERA / NESHAPSource

    Asbestos Hazard Emergency Response Act & EPA NESHAP

    Asbestos-containing materials (ACMs) disturbed during renovation or demolition are regulated under NESHAP (40 CFR Part 61, Subpart M). Sampling must be performed by an accredited inspector. Abatement requires a licensed contractor and proper disposal at an approved facility.

  • OSHA 29 CFR 1926.1101Source

    OSHA Asbestos Standard for Construction

    OSHA sets permissible exposure limits (PEL) for asbestos at 0.1 fibres per cubic centimetre of air (f/cc) as an 8-hour TWA. Workers performing asbestos-related tasks must be trained, and air monitoring is required during disturbance activities.

Questions about testing?

Call us before work begins. We will walk you through what is required and coordinate everything from there.